- August 8, 2024
Repair of approximately 8,500 square feet of existing drive/cul-de-sac and overlay of approximately 35,600 square feet of existing hill/cul-de-sac completed on Traco Drive (Fox Run project)
More about this project:
- Cut out 6 areas of hill and pre-rolled cul-de-sac
- Repaired damaged areas and leveled to pre-existing levels
- Place overlay on 35,600 square feet of drive/cul-de-sac
- Sealed edge where old asphalt meets new asphalt